EPC for CBG plants
End-to-end support for engineering, procurement, erection, testing, and commissioning of biogas and BioCNG facilities.
Advanced Biogas & BioCNG Solutions
EPC, technology integration, and long-term operations support for CBG plants in India.
Nextro brings tested German and European biogas know-how into Indian execution, helping project owners convert organic waste into BioCNG, renewable fertilizer, and dependable plant data.
Feedstock
Our technology efficiently processes a wide range of agricultural, industrial, and organic residues to maximize biogas production while ensuring stable and reliable plant performance throughout the year.
Services
The site is written for serious plant owners: what gets built, how the gas is upgraded, and how the asset is kept productive after commissioning.
End-to-end support for engineering, procurement, erection, testing, and commissioning of biogas and BioCNG facilities.
European-proven process know-how adapted to Indian feedstocks, site conditions, compliance needs, and operating teams.
PSA/VPSA-based upgrading with H2S removal, drying, methane recovery, booster compression, and cylinder filling packages.
Operator training, daily and monthly checks, online diagnostics, spare parts support, and long-term plant tuning.
PLC, SCADA-ready control panels, sensors, gas analyzers, alarms, and instrumentation for dependable plant visibility.
Solid-liquid separation, organic fertilizer handling, liquid bio-fertilizer flow, and bagging systems for additional value.
Technology Flow
Nextro's proposed systems use feed preparation, CSTR digestion, gas conditioning, PSA/VPSA upgrading, methane recovery, and high-pressure BioCNG handling. Each plant can be adapted around available feedstock and target output.
Performance
The company brochure includes a representative BioCNG project design using 64 to 130 tons per day of feedstock. The example plant is designed for 24-hour operation, mesophilic digestion, and clean BioCNG output with organic fertilizer recovery.
Mesophilic operating range with 28–30 day retention time.
Biogas upgrading capacity in the representative scope.
Booster compressor and filling station package.
Representative liquid bio-fertilizer generation.
European Tie-Ups
Nextro's specialty is working with German and European technology companies whose processes have already been tested repeatedly in mature biogas markets, then adapting that know-how for Indian feedstock, teams, and commercial conditions.
Pre-treatment and process selection improve substrate availability and methane recovery.
Clear equipment scope, civil interfaces and commissioning responsibilities reduce project ambiguity.
Spare strategy, routine checks and operator training ensure reliable long-term plant performance.
PROJECT DISCUSSION
Share your feedstock details, proposed BioCNG production, land availability and project location. Our engineering experts will recommend the most suitable EPC and technology solution for your project.